China Procurement Services: Complete Guide for Importers

China manufacturing production control -Tiroflx on the ground in Ningbo

Buying from China is not simply a matter of finding a supplier and placing an order. For any brand, retailer or importer that sources products regularly, procurement in China is a structured process that spans supplier identification, qualification, production monitoring, quality control, logistics and risk management.

When procurement is handled correctly, it reduces delays, controls quality, prevents cost surprises and builds reliable supplier relationships. When it is handled poorly, it creates exactly the problems most buyers fear: defective products, shipment delays, regulatory non-compliance and damaged supplier relationships.

This guide covers the complete China procurement process, including what it involves, where buyers commonly make mistakes, how execution partners differ from sourcing agents, and how a local manufacturing execution partner helps manage it from start to finish.

China Procurement Process at a Glance

Before getting into the detail, here is the full procurement process from requirements to delivery.

StepStageWhat Happens
1Requirements DefinitionDefine product, quality, packaging, budget, timeline and compliance needs.
2Supplier SearchIdentify potential suppliers, factories or manufacturers across China.
3Supplier QualificationVerify licences, capabilities, export experience, quality systems and reliability.
4RFQ and Cost AnalysisCompare quotations, payment terms, MOQ, tooling, packaging and hidden costs.
5Sample DevelopmentReview samples, confirm specifications and approve production standards.
6Production Follow-UpMonitor progress, timelines, communication and production risks.
7Quality ControlInspect products, check defects, packaging and compliance with buyer requirements.
8Shipment CoordinationCoordinate packaging, consolidation, documents and shipment release.

Each stage is covered in detail below.

What Is Procurement?

Procurement is the complete process of obtaining goods or services from external suppliers. It includes identifying what is needed, finding and qualifying the right suppliers, negotiating terms, managing production, ensuring quality and coordinating delivery.

In international trade, procurement goes well beyond simple purchasing. It involves relationship management, risk reduction and supply chain coordination across borders, languages, time zones and quality standards.

For buyers sourcing from China, procurement typically spans weeks or months per project and involves multiple parties: factories, freight forwarders, quality inspectors, compliance teams and logistics providers.

Procurement vs Purchasing: What Is the Difference?

These two terms are often used interchangeably, but they describe very different activities.

 ProcurementPurchasing
ScopeStrategicTransactional
FocusSupplier management, risk and processOrder placement and delivery
Time horizonLong-term supplier relationshipsShort-term or single transactions
GoalReduce risk, control quality, build capabilityAcquire products at agreed price and timing
InvolvesQualification, audits, monitoring, QCPurchase orders, invoices, delivery tracking

Purchasing asks whether the product can be bought. Procurement asks whether it should be bought, from which supplier, and how to ensure it consistently meets required standards.

For brands buying regularly from China, the procurement approach is almost always more valuable. Qualified suppliers, monitored production and inspected goods reduce long-term cost far more than the cheapest unit price on a single order.

Procurement vs Sourcing: What Is the Difference?

Sourcing and procurement are often confused, particularly in the context of China supply chains.

 SourcingProcurement
ScopeFinding and selecting suppliersManaging the complete buying process
StageBeginning of the processComplete process from need to delivery
FocusSupplier identification and selectionSupplier lifecycle: qualification, orders, QC, logistics
OutputSupplier list or selectionDelivered product meeting requirements

Sourcing answers the question of who can make the product. Procurement answers how to turn that supplier into a reliable production partner.

Sourcing is a critical part of procurement, but it is only the first part. The work that follows sourcing, including qualification, sampling, production monitoring, quality control and logistics coordination, is where most of the value and most of the risk exists.

Sourcing vs Procurement vs Manufacturing Execution

Many buyers use these three terms interchangeably. They are not the same, and choosing the wrong type of partner leads to gaps in execution.

 SourcingProcurementManufacturing Execution
Main goalFind suppliersManage the supplier lifecycleDeliver production successfully
StageBeginning of processComplete processEnd-to-end production management
FocusSupplier identificationQualification, orders, QC, logisticsFactory control, production follow-up, QC, compliance
OutputSupplier listDelivered product meeting requirementsProduction managed from brief to shipment
Best forOne-time or exploratory needsOngoing import programsComplex production requiring local oversight

For brands with established products and regular import programs, manufacturing execution delivers the most consistent results. It treats production as a managed operational system rather than a series of individual transactions.

This is why Tiroflx operates strictly as a Western-managed Manufacturing Execution Partner in Ningbo, not as a sourcing broker or trading intermediary. The distinction matters: a sourcing agent hands off a supplier list. Tiroflx manages the production system.

Why Procurement in China Is Different

Procuring from China presents specific challenges that do not exist when buying domestically or from closer markets.

Large supplier base with significant quality variation.

China has hundreds of thousands of factories. The range in quality, reliability, compliance and communication between suppliers is enormous. Two factories producing the same product at the same price can deliver completely different outcomes.

Operational insight: A trading company and a direct manufacturer may quote the same price. One has ISO-certified processes, in-house QC and export experience. The other is a small operation that subcontracts production to whoever is available. From a catalogue or an Alibaba profile, they can look identical. The difference only becomes visible through qualification: business licence scope, factory visit, production line inspection.

Communication challenges.

Time zone differences, language barriers and varying communication styles create gaps in information. Production problems are often not reported until they have already become serious.

Operational insight: Chinese factories typically communicate good news immediately and delay bad news for as long as possible. A timeline slippage that starts as a few days often becomes two or three weeks by the time a buyer in a Western time zone becomes aware of it. Teams operating in Chinese, on the factory floor rather than just over email, catch these situations far earlier.

Subcontracting risks.

Many Chinese factories outsource part or all of production to other facilities. The factory that quotes and samples the product may not be the one producing it. This is one of the most common sources of unexpected quality problems.

Operational insight: Subcontracting happens most often during peak production periods, particularly in the weeks before Chinese New Year, Golden Week and major export deadlines, when factory capacity is strained. The subcontracted facility may have lower quality standards, different equipment or less experience with the specific product. One way to identify this risk: check whether equipment tags and machine licence plates match the registered factory. Unannounced production visits are the most reliable way to verify.

Working with a China supplier and concerned that production may be going to a subcontractor? Send us the supplier details and we will tell you exactly what to verify, and how.

Quality variability across production runs.

A sample may be perfect. The mass production batch may not be. Without production monitoring and pre-shipment inspection, quality variation is often not discovered until goods arrive at the warehouse.

Operational insight: This happens for a predictable reason. The sample is often produced by the factory’s most skilled workers under close supervision. Mass production runs at a different pace, with different staffing. If the production specifications are not formally locked and documented, the factory uses its own interpretation. Approved samples should always be physically retained and referenced against production output, not just photographed.

Compliance requirements.

Products destined for the US, EU, UK and Australia typically require specific certifications, testing and documentation. CE, RoHS, REACH, FCC and CPSIA requirements must be managed proactively, not after production is complete.

Operational insight: Many Chinese factories claim certifications they do not actually hold, hold certificates that are expired, or hold certificates that apply to a different product or production facility. Always verify that the certification was issued by an accredited body, that the scope matches the specific product being ordered, and that the certificate is current. The cost of confirming this before production is a fraction of the cost of a failed compliance test after a shipment has left China.

Have a CE or RoHS certificate from a supplier and not sure whether it covers your specific product and production facility? Send us the certificate details and we will advise on what to check before production begins.

Payment terms and leverage.

Most Chinese factories require significant deposits before production begins. Once production starts, leverage shifts to the factory. Without a local partner managing relationships and timelines, buyers have limited visibility and limited recourse.

Operational insight: A 30% deposit on a 50,000 USD order locks in 15,000 USD before a single unit is produced. After that payment, the buyer’s practical leverage is limited, especially when managing remotely across language and time zone barriers. Local presence changes this dynamic. A partner who visits the factory, knows the production manager personally and operates in the same time zone and language maintains far more effective oversight throughout the production cycle.

Why Procurement Projects Fail in China

Most procurement problems in China are predictable. The same failures appear repeatedly across industries, order sizes and product categories.

Wrong supplier selected. The supplier search ends too quickly, or decisions are made on price alone. The factory cannot reliably meet quality standards, delivery timelines or compliance requirements at production scale.

Poor or incomplete specifications. Requirements are not defined clearly before the supplier search begins. Factories interpret ambiguous specifications differently. Samples look acceptable but mass production diverges from what the buyer expected.

No factory verification. The buyer relies on platform ratings, quick communication and sample quality to assess supplier reliability. Business licence, production capability, quality systems and export history are never properly checked.

No production visibility. Once the deposit is paid, the buyer has no insight into whether production has started, whether timelines are being met or whether the contracted factory is actually producing the goods. Problems surface only at shipment or after arrival.

No quality inspection before shipment. The factory conducts its own inspection. No independent pre-shipment check is arranged. Defective goods arrive at the destination warehouse. Returns, rework and commercial penalties follow.

Compliance discovered too late. The buyer assumes the factory will manage CE, RoHS, CPSIA, FCC or other certification requirements. After production, testing reveals failures. Goods cannot enter the market without costly rework or retesting.

Communication breakdown. Emails are not answered clearly. Timelines are confirmed but not met. Problems are minimised or not reported at all. By the time the buyer understands what has happened, the delay or defect is already serious.

Understanding these failure modes is the first step to avoiding them. Structured procurement exists specifically to address each one.

The Complete China Procurement Process

Step 1: Requirements Definition

Before any supplier search begins, requirements must be defined clearly. This includes:

  • Product specifications: dimensions, materials, components, tolerances
  • Packaging requirements: retail packaging, labelling, carton specifications
  • Quality standards: acceptable defect rates, inspection criteria
  • Compliance needs: certifications, testing requirements, country-specific standards
  • Commercial terms: target unit cost, MOQ, payment terms, delivery timeline

Suppliers cannot be evaluated accurately without clear requirements. Gaps at this stage create misalignment throughout the entire process.

Step 2: Supplier Search

Supplier search involves identifying factories or manufacturers that can realistically produce to the required specifications. Sources include trade platforms such as Alibaba, Made-in-China and Global Sources, trade shows including the Canton Fair and industry-specific exhibitions, industry referrals, and direct factory contact via manufacturing hubs across China.

A supplier list is not a qualified supplier list. Every potential supplier requires evaluation before orders are placed.

Step 3: Supplier Qualification

Qualification separates capable suppliers from unsuitable ones before any money changes hands. A thorough qualification process includes:

  • Business licence verification: confirms the company is legally registered and the scope covers the products being ordered
  • Factory capability assessment: production lines, equipment and capacity match the product type and volume
  • Export licence and market familiarity: evidence of previous exports to the destination market
  • Quality management systems: ISO 9001 or equivalent internal QC processes
  • Relevant certifications: CE, BSCI, SA8000, ISO and product-specific certifications
  • Communication responsiveness: direct, clear answers from someone with decision-making authority

Business licence scope matters more than most buyers realise.

A Chinese business licence specifies the exact activities the company is legally permitted to conduct. A factory may list manufacturing in their scope, but if that manufacturing scope does not specifically cover the product category being ordered, they may legally be a trading company, an assembly operation or a sub-tier component maker rather than the primary manufacturer needed. Always verify the business licence scope matches the actual work being requested.

Registered capital as a reliability indicator.

The registered capital on a Chinese business licence indicates the amount of capital the company has legally committed to the business. While it is not a guarantee of financial stability, it is a useful indicator. A factory quoting on a large program with very low registered capital has a limited financial buffer against production problems, raw material cost spikes or operational disruptions. This does not disqualify a supplier, but it is a risk factor that should be assessed alongside order size and program complexity.

Qualification should include an on-site factory audit or third-party audit report for significant orders.

Step 4: RFQ and Cost Analysis

Once qualified suppliers are identified, request for quotation documents are sent. A complete RFQ includes full product specifications, required certifications, packaging specifications, target quantity, timeline and payment term requirements.

When quotations are received, the comparison should be based on total landed cost rather than unit price alone. The following cost components are commonly underestimated or omitted from initial quotations:

  • Tooling and mould costs: many factories quote attractive unit prices but add tooling costs separately, sometimes months after initial agreement
  • Laboratory testing: CE, RoHS, REACH, FCC, CPSIA and similar certifications require independent lab testing that the buyer typically pays for, not the factory
  • Country-specific packaging requirements: language requirements, safety labelling, recycling marks and retail packaging specifications vary between the US, EU, UK and Australia, and each requires separate artwork and sometimes separate packaging runs
  • Currency fluctuation buffer: quotations in USD or EUR from Chinese suppliers do not always account for RMB exchange rate movements across a long production program
  • Payment term costs: 30/70 payment terms carry a real cost of capital that is rarely factored into unit price comparisons
  • Rework and inspection costs: if goods fail pre-shipment inspection, rework inside China is typically a buyer cost, not a factory cost under standard contract terms

Total landed cost always exceeds the unit price quotation. The question is by how much, and whether that gap was anticipated.

Planning a new China order and want to map out the complete cost structure before committing to a supplier? Send us your product brief and our team will walk through every cost component with you, including the ones most buyers miss.

Step 5: Sample Development

Sample development confirms that the supplier can produce to specification before production begins. The process typically includes initial samples, revised samples based on buyer feedback, and pre-production samples confirming production-ready versions. Sample approval should be documented formally against specifications that production will be measured against.

Step 6: Production Follow-Up

Production monitoring is one of the most underinvested areas in China procurement. Once production begins:

  • Confirm production has started on the agreed date
  • Monitor timeline against milestones
  • Identify and address problems before they become delays
  • Verify that the approved factory is producing, not subcontracting without approval
  • Confirm materials and components match approved specifications

For buyers without a local team, production follow-up requires a local agent or representative who can communicate directly with factories in Chinese.

Step 7: Quality Control

Quality control inspection should occur before goods leave the factory. Standard inspection types include:

  • Pre-production inspection (PPI): verifies materials and components before production starts
  • During production inspection (DUPRO): checks quality at a mid-production stage
  • Pre-shipment inspection (PSI): final check on completed goods before shipment is authorised

Inspection follows AQL (Acceptance Quality Limit) standards, which define acceptable defect rates by category. Results determine whether to accept, reject or require rework before shipment. For further detail on inspection standards, see the AQL inspection guide and pre-shipment inspection checklist on this website.

Compliance and Regulatory Testing

For products destined for the US, EU, UK or Australia, compliance testing is not optional, and it cannot be left to the factory to manage independently.

When to arrange compliance testing.

Testing should be initiated at the pre-production stage, not after mass production is complete. Waiting until goods are finished before arranging laboratory testing is the single most common reason buyers discover compliance failures after a shipment is already on the water.

Who arranges and pays for testing.

In most procurement contracts, the buyer arranges and pays for independent laboratory testing. The factory provides samples. Common testing bodies include SGS, Intertek, TUV Rheinland and Bureau Veritas. Using an internationally accredited body rather than a factory-nominated local lab is critical for testing that will be accepted by retailers and customs authorities.

Key standards by market:

MarketCommon Standards
European UnionCE marking, RoHS, REACH, WEEE
United StatesFCC, CPSIA, UL, FDA where applicable
United KingdomUKCA post-Brexit CE equivalent
AustraliaRCM marking, ACMA electrical, ACCC product safety

What happens if products fail testing.

A failed compliance test after mass production means rework at the buyer’s cost if feasible, write-off if not, and delayed shipment in either case. For products with embedded electronics or chemicals, rework may not be possible. The only effective strategy is testing at the pre-production stage, when corrections are still manageable.

Step 8: Shipment Coordination

Once goods pass inspection, shipment coordination begins. This covers packaging, labelling and carton marks confirmed for the destination market; consolidation arranged if shipping from multiple factories; export documentation prepared including commercial invoice, packing list and certificate of origin; freight forwarding booked; and customs or compliance requirements at destination managed.

Supplier Qualification Checklist

Before placing orders with any new China supplier, verify the following:

Legal and business verification

  • ☐ Business licence is valid and matches the trading name
  • ☐ Registered capital is appropriate to the scale of business
  • ☐ Business scope covers the products being ordered

Factory capability

  • ☐ Factory visit or audit completed, or a third-party audit report has been reviewed
  • ☐ Production lines and equipment match the product type
  • ☐ Production capacity matches required order volume

Export experience

  • ☐ Export licence is valid
  • ☐ Evidence of previous exports to the destination market exists
  • ☐ Factory is familiar with destination market compliance requirements

Quality systems

  • ☐ Quality management system is in place (ISO 9001 or equivalent)
  • ☐ Internal QC process is documented
  • ☐ Defect tracking and corrective action processes exist

Certifications

  • ☐ Relevant product certifications are verified (CE, RoHS, BSCI, ISO and others as applicable)
  • ☐ Certification documents are current and not expired
  • ☐ Certification scope covers the products being ordered

Communication

  • ☐ Responses are clear, timely and in the buyer’s language
  • ☐ Technical questions are answered with specific detail
  • ☐ The contact person has decision-making authority

Supplier Lifecycle Management

Procurement is not a one-time event for each supplier. For repeat-order programs, supplier management follows a lifecycle that creates compounding value over time.

StageWhat It Achieves
Supplier SearchIdentifies candidate factories matching product and quality requirements
Supplier QualificationConfirms capability, compliance and reliability before orders are placed
Sample ApprovalLocks specifications and sets the quality benchmark for production
First Production OrderValidates the supplier at scale under real conditions
Quality InspectionVerifies output against approved samples and standards
Shipment and DeliveryConfirms compliance, documentation and final delivery accuracy
Supplier Performance ReviewTracks defect rates, timeline adherence and communication quality
Repeat OrderBuilds on verified performance to improve speed, pricing and reliability

Buyers who treat procurement transactionally, one order at a time without tracking performance, miss the compounding value of well-managed supplier relationships. Over time, preferred suppliers deliver faster, offer better pricing and prioritise buyer orders because the relationship has been built deliberately.

Why the Lowest Quote Is Often the Most Expensive

Unit price is one variable in total landed cost. It is rarely the most important one.

Consider two quotations for the same product:

 Supplier ASupplier B
Unit price$4.20$4.50
Defect rate3 to 4%Under 1%
Shipment timelineFrequently delayedConsistently on time
CommunicationSlow and unclearDirect and responsive
Compliance documentationIncompleteComplete and current

On a 5,000 unit order, Supplier A’s lower unit price saves 1,500 USD. But a 3% defect rate produces 150 defective units. Rework, replacement shipping and commercial penalties from a retail buyer typically exceed that saving, often by a significant multiple.

Total landed cost includes: unit price, tooling, packaging, testing, freight, import duties, rework, returns and the commercial cost of delays. A supplier that is slightly more expensive on unit price but delivers consistently lower defect rates, reliable timelines and complete documentation almost always costs less in total.

Procurement decisions based only on unit price systematically undercount the real cost of working with the wrong supplier.

Manufacturing Execution Partner vs Traditional Sourcing Agent

Not all China-based procurement partners work the same way. There is a meaningful difference between a traditional sourcing agent and a manufacturing execution partner, and that difference affects outcomes directly.

 Traditional Sourcing AgentManufacturing Execution Partner
Primary roleFind suppliers and facilitate introductionsManage execution from brief to shipment
Production involvementLimited: buyer manages directly after introductionActive production follow-up throughout
QC coordinationOften limited or outsourced to buyerFull oversight: pre-production, DUPRO, pre-shipment
AccountabilityIntroduction-based with limited liability after matchingProcess-based and responsible for execution quality
Production visibilityLimited after supplier handoverContinuous production monitoring
Factory communicationOften limited to the supplier search phaseDirect communication in Chinese throughout production
Compliance coordinationTypically buyer-managedCoordinated as part of the production process

A sourcing agent is valuable for finding suppliers. A manufacturing execution partner is valuable when the buyer needs someone to ensure those suppliers actually deliver, on time, at the right quality and with the right documentation.

For brands with complex products, strict quality standards, compliance requirements or tight delivery windows, manufacturing execution is almost always the more effective model.

The Biggest Procurement Mistakes in China

Choosing the lowest quote. The cheapest price often reflects lower-grade materials, fewer quality control steps or hidden problems. Total landed cost, including quality failures, rework, delays and returns, is almost always higher with the cheapest supplier.

Skipping supplier verification. Assuming a supplier is reliable based on their platform profile, sample quality or quick communication is one of the most common procurement errors. Verification must include documented checks, not assumptions.

No production monitoring. Production problems discovered after goods ship are far more expensive to fix than problems identified during production. Without monitoring, buyers have no visibility until goods arrive.

No quality inspection. Relying on the factory to self-inspect is not quality control. Independent pre-shipment inspection by a third party is the minimum standard for protecting against defective shipments.

Relying on a single supplier. Single-supplier dependency creates significant risk. Production capacity problems, factory closures, quality failures or pricing pressure all become serious problems without an alternative source.

Not managing compliance proactively. Compliance requirements for CE, RoHS, CPSIA, FDA and similar standards cannot be resolved after production. Products that fail compliance testing after shipment create significant cost and commercial problems.

How Procurement Services Reduce Risk

Working with a local procurement partner changes the risk profile of China buying programs in measurable ways.

Supplier risk. Local qualification and verification reduces the likelihood of working with unsuitable suppliers. A partner with established factory relationships can also identify reliable alternatives faster.

Quality problems. Multi-stage quality control before, during and after production catches problems before they become shipment failures or customer complaints.

Delays. Local production monitoring identifies timeline risks early. Problems that take weeks to surface through email can be escalated and addressed within days through local oversight.

Communication gaps. A local team operating in Chinese and English reduces the information loss that occurs when buyers manage suppliers entirely remotely across language and time zone differences.

Cost overruns. Structured procurement with clear specifications, documented samples and agreed terms reduces the scope for misunderstandings, change requests and cost escalation during production.

Why Location Matters: Ningbo-Based Operations

Where a procurement partner is based affects what they can actually deliver on a buyer’s behalf.

Tiroflx operates from Ningbo, one of China’s primary manufacturing and export hubs, located within close proximity to some of China’s largest manufacturing clusters and adjacent to Shanghai.

Working from Ningbo enables:

  • Direct access to coastal manufacturing clusters in Zhejiang and Jiangsu
  • Port access through Ningbo-Zhoushan, one of China’s major export ports
  • Consolidation warehouse for managing shipments from multiple factories
  • Same-day or next-day factory access for production checks, QC visits and supplier meetings

For buyers, local presence means problems are identified faster, factories are visited in person and production oversight is real rather than remote. Tiroflx’s Ningbo team manages production programs for international importers across automotive accessories, consumer goods, and industrial components, operating in Mandarin on the factory floor and in English for buyer reporting. That dual-language, on-site capability is what makes local presence a structural advantage rather than a marketing claim.

How Tiroflx Supports Procurement Teams

Tiroflx works as a China-based manufacturing execution partner, supporting importers, retailers and brands that need structured procurement management rather than a one-off supplier introduction.

Supplier Sourcing. Tiroflx identifies and approaches factories across China that match the product, quality, volume and compliance requirements of each project, drawing on category knowledge and existing factory relationships rather than relying only on trading platforms.

Supplier Qualification. Before recommending any supplier, Tiroflx verifies business registration, factory capability, export experience, quality systems and relevant certifications, reducing the risk of working with unsuitable suppliers before any order is placed.

Production Follow-Up. Production progress is monitored, factories are communicated with directly in Chinese, and timeline risks or production problems are flagged early. Buyers receive regular updates without managing factories directly across time zones.

Quality Control. Multi-stage quality inspection is managed: pre-production, during production and pre-shipment. The QC process follows AQL standards and covers product quality, packaging, labelling and compliance requirements.

Consolidation. Products from multiple factories can be consolidated before shipment, reducing freight costs and simplifying export documentation management.

Shipment Coordination. Export documentation, freight booking, packaging confirmation and shipment release are coordinated, reducing the administrative burden on procurement teams managing orders across multiple suppliers.

Example Procurement Scenarios

Automotive accessories importer. A distributor sourcing car accessories across multiple product categories requires procurement support for supplier qualification, consolidated shipments from multiple factories, and pre-shipment inspection to verify product quality and packaging compliance before goods leave China.

Retail brand with seasonal products. A retail brand placing seasonal orders needs production monitoring to manage tight delivery windows, multi-stage quality control to protect brand standards, and documentation support for compliance with destination market requirements.

Industrial equipment buyer. A buyer sourcing components or equipment from Chinese manufacturers needs factory audits, technical specification management, certification verification and production follow-up across longer lead times.

Who Uses Procurement Services?

China procurement services are used by:

  • Importers managing regular product programs from Chinese factories
  • Retailers sourcing private-label or branded products
  • E-commerce brands on Amazon, Shopify and other platforms
  • Distributors managing multiple SKUs and product categories
  • Industrial buyers sourcing components, equipment or materials
  • Procurement teams within larger businesses looking for local execution support

The common thread is that these buyers want a reliable, managed procurement process rather than just a supplier list.

Run a China Procurement Health Check

Sourcing a new product, reviewing an existing supplier relationship, or planning your first structured import program? Tell us what you are working on. Our Ningbo-based team will identify where your current approach is exposed and what a structured procurement process would look like for your situation.

Send us your project details and our team will review where Tiroflx can add value.

Picture of Assaf Sternberg

Assaf Sternberg

Assaf Sternberg, founder and operations lead of TIROFLX (Ningbo, China), has managed more than a thousand sourcing and manufacturing projects since 2008 for Amazon sellers, retailers, and global brands.

His expertise covers QC/AQL systems (DUPRO, PSI), compliance (CE, FCC, UN38.3, REACH), FBA prep, ERP/WMS setup, and landed-cost optimization across the U.S., EU, and Israeli markets.

Operating from China, Hong Kong, and Thailand, Assaf focuses on transparent, sustainable, and results-driven sourcing solutions that help importers succeed long term.

Connect with Assaf on LinkedIn